Friday, November 14, 2008

More Construction

Mom and I went to Scottsbluff today. We got quarterround for the rooms that will have hard wood and a kitchen faucet (which I am not in love with). Jason was able to spend the day on the McGinley again. He was supposed to ship cows today (and every other day it has snowed in the past two weeks), but the weather didn't cooperate. He has 76 cows left and he can't seem to get rid of them. So Dad and Jason finished installing all the cupboards. I could have done with less drawers and more cupboards, but I will take what I get.


Dallie's room. I don't like the color too much (it's more peach than pink), but I will leave it for now.

The wallpaper was torn out of the bathroom and the guys put a little texture on the walls. This bathroom doesn't have a shower, so that is on the list of things that has to get done before we move in.

The master bedroom. Jason and Dad were able to get the paneling off and textured the walls. Hopefully we'll prime the walls tomorrow. I haven't decided on a paint color for the master. Below is a picture of the existing closet in the master (it is under the stairs to the attic). Needless to say, we are putting a closet at one end of the room.

This is the wall the closet will be on.

No comments: